The target turn around time for designs is 20 working days from the receipt of suitably scaled final working drawings (20 days is an indication and may vary depending on the demand on the design office). If any details, drawings or data, required to prepare the designs are not supplied with this request the 20 day period may be extended. Every effort will be made to comply with any special request for the preparation of a design but it will be subject to the current demand. See Ideal Stelrad Group - Heating Design Service Terms and Conditions.
Note that 'U' Values will be taken as the MAXIMUM PERMITTED by the current edition of the Building Regulations unless otherwise specified as below (W/m2 deg C)
Home-Choice, c/o Ideal Stelrad Group 69 - 75 Side, Newcastle upon Tyne, NE1 3JE
T: 0191 261 51 60 E: info@homechoice.com